CSG performed design of roadway improvements for this primary arterial street. The project included the widening of the existing AC roadway to provide appropriate width for new bike lanes on both sides of Imjin Parkway from Imjin Road to Reservation Road. Work also included improvements to concrete sidewalks, curb, gutter, and passageways, providing new striping and markings, metal guard rail construction, signage, traffic signal modifications, and an asphalt concrete overlay. The project utilized high visibility green bike lanes for road areas where vehicles would cross over the new bicycle lanes. The project received Regional Transportation Improvement Program funding and required coordination with Caltrans Local Assistance to obtain the E76 Authorization to Proceed with Construction.