This $2.7 million project consisted of the analysis and design for roughly 30 miles of pavement maintenance and rehabilitation for residential, collector, and arterial streets in the hillsides of Hillsborough. CSG served as design consultant managing all aspects of the PS&E package, including: coordination with Town staff; management of subconsultants; pavement analysis and recommendations; recommendations for additional bicycle safety signage and striping; and preparation of PS&E for 30 miles of street rehabilitation, a new 10,000 SF parking lot, a raised intersection, and resurfacing, striping and signage for the Town Hall parking lot and two fire station parking lots.